Facts
| Name of the project: |
TORRE TITANIUM LA PORTADA |
| Location: |
Santiago, Chile
AV. ISIDORA GEYENECHEA 2800 –
ESQ. AVENIDAS VITACURA Y
ANDRES BELLO - LAS CONDES |
| |
|
| Height: |
190 meters |
| Stories: |
52+ helicopter landing pad |
| Underground: |
7 |
| Main use of the tower: |
office space |
| Main use for the first floor: |
market |
| Heliport: |
capacity for two helicopters |
| Total surface: |
over 120.000 m² |
| Surface for sale: |
over 72.000 m² |
| Elevators: |
20 of high-speed |
| Structure: |
reinforced concrete and steel |
| Facade: |
crystal, granite and aluminium |
|