Facts
Further building facts:
2.000 ton steel construction roof
10.000 m² glass
16.000 m² roof area
Building excavation data:
General
210 m long, 120 to 40 m wide
14 m deep
approx. 15.579 m² surface area within the excavation
Drilling poles:
approx. 578 m of excavation site enclosed by overlapping drilling poles
(total of 775 poles) with a
total length of approx. 11.800 m
visible pole wall: approx. 5.147 m²
Anchor:
Total anchor length approx. 11.458 m in two anchor positions
Excavated material:
Total of approx. 158.400 m³, which corresponds to
12.000 truck loads
Building shell:
Execution:
Concrete floor slab white tank: approx. 19.500 m³
Concrete exterior wall white tank: approx 3.200 m³
Total reinforcement: 8.500 to
Total concrete: approx. 55000 m³
That corresponds to 6100 concrete mixers